Laporan Bulan Ini


STATUS PEMANTAUAN PROJEK (KERJA FIZIKAL DI TAPAK)

 

PELAN LANTAI BANGUNAN UTAMA.JPG

1-pelan-lantai-bangunan-utama

 

BANGUNAN UTAMA

2-bangunan-utama

 

3

 

4

 

5

 

PEMANDANGAN KERJA-KERJA DI BANGUNAN UTAMA

6-pemandangan-kerja-kerja-di-bangunan-utama

 

7-pemandangan-kerja-kerja-di-bangunan-utama

 

ZON 1

MAIN BUILDING (LEVEL 4) WORK PROGRESS

9-main-building-level-4-work-progress

 

MAIN BUILDING BETWEEN LEVEL 4 & LEVEL 5

10-main-building-between-level-4-level-5

 

CONCRETED CORBEL 37 Nos COMPLETED AT MAIN BUILDING BETWEEN LEVEL 4 & LEVEL 5

11-concreted-corbel-37-nos-completed-at-main-building-between-level-4-level-5

 

MAIN BUILDING INSTALLATIONS OF PRECAST BEAM, CONNECTION REBAR, FORMWORK & STEEL BAR AND CONCRETE OF THE CAST IN SITU BEAM

12-main-building-installations-of-precast-beam-connection-rebar-formwork-steel-bar-and-concrete-of-the-cast-in-situ-beam

 

MAIN BUILDING (LEVEL 1)

13-main-building-level-1

 

MAIN BUILDING (LEVEL 2)

14-main-building-level-2

 

MAIN BUILDING (LEVEL 3)

15-main-building-level-3

 

PEMANDANGAN KERJA-KERJA PEMBINAAN DI ZON 1

16-pemandangan-kerja-kerja-pembinaan-di-zon-1

 

PEMANDANGAN KERJA-KERJA PEMBINAAN DI ZON 1

17-pemandangan-kerja-kerja-pembinaan-di-zon-1

 

PEMANDANGAN KERJA-KERJA PEMBINAAN ARAS ANTARA ARAS 4 & ARAS 5 DI ZON 1

18-pemandangan-kerja-kerja-pembinaan-aras-antara-aras-4-aras-5-di-zon-1

 

PEMANDANGAN KERJA-KERJA PEMBINAAN ARAS ANTARA ARAS 4 & ARAS 5 DI ZON 1

19-pemandangan-kerja-kerja-pembinaan-aras-antara-aras-4-aras-5-di-zon-1

 

KERJA-KERJA MENGIKAT BATA ARAS 3 DI ZON 1

20-kerja-kerja-mengikat-bata-aras-3-di-zon-1

 

KERJA-KERJA MENGIKAT BATA ARAS 3 DI ZON 1

kerja-kerja-mengikat-bata-aras-3-di-zon-1

 

KERJA-KERJA MENGIKAT BATA ARAS 3 DI ZON 1

22-kerja-kerja-mengikat-bata-aras-3-di-zon-1

 

KERJA-KERJA MENGIKAT BATA ARAS 3 DI ZON 1

23-kerja-kerja-mengikat-bata-aras-3-di-zon-1

 

Zone 2

MAIN BUILDING (LEVEL 4), CONCRETED OF COLUMN = 66 NOS COMPLETED

25-main-building-level-4-concreted-of-column-66-nos-completed

nbsp;

MAIN BUILDING (LEVEL 5), CONCRETED CORBEL = 52 NOS COMPLETED

26-main-building-level-5-concreted-corbel-52-nos-completed

 

MAIN BUILDING (LEVEL 5) PRE CAST IN SITU27-main-building-level-5-pre-cast-in-situ

 

Gambar Projek : Pandangan Statik